Roller Replacement shaft kit
Removal of shaft from roller.
Apply localized heat to the assembly to
400° F (250° C). And disassemble
Installation of shaft in roller.
rag to remove any oil or debris
that could cause a problem installing the shaft. After the tube and the shaft has
, to cover the shaft completely in loctite. Insert
aft until the shaft bottoms out.
hen the shaft has bottomed out the exposed shaft
should be 1 7/8” long. The Loctite will
take 24 hours to fully cure.
lean tube and shaft with a shop rag to get rid of any oil or debris.
Exposed shaft should measure 1 7/8”
Comentarios a estos manuales